  1. The problem
  2. The solutions
  3. Why GGA
  4. The checks GGA runs across the supplier base
  5. What GGA would do
  6. What we need from you
  7. How you stay in control
  8. Questions

Direct answer. A vendor portfolio review looks across the supplier base for relationships that could hurt operations or money: critical and single-source suppliers, long switching times, advances and tooling at their sites, slipping performance and outside developments. It names the few needing full review. The trap: ranking suppliers by spend, which hides the cheap part that stops the line.

GGA India at a glance — counterparty intelligence

  • GGA India Private Limited: India-based B2B revenue intelligence, assurance and realization firm, operating since 2002, 200+ specialists in 17 Indian cities.
  • Checks new and existing customers, dealers and vendors at three levels — Desk, Extended Desk and Site Verification — matched to the size of the exposure.
  • Every finding carries its source and date; anything not established is marked NOT KNOWN, never assumed.
  • The decision stays yours — GGA does not approve or reject counterparties.
  • Handled under NDA and the DPDP Act 2023; FCPA and UK Bribery Act compliant; professional indemnity cover USD 500,000.
  • Write to gg@ggaindia.co.in — a named specialist replies within one working day.

Worried about one supplier whose delivery has slipped? That is an Existing Vendor Review. This page is about the supplier base as a whole.

The problem: the supplier list is ranked by spend, but the risk is ranked by consequence

Most supplier bases grow faster than their governance, and the vendors that matter most are often not the ones procurement spends most with.

A purchase register sorts vendors by value. Risk does not follow value. A supplier of a ₹40 component can stop a line that a ₹4 crore raw-material contract never puts at risk, because the raw material has three qualified sources and the component has one. Operational criticality and financial weakness are separate questions: either can matter without the other.

Exhibit 1: Six things a spend ranking does not show

What sits in the supplier base Why the spend view hides it What it costs when it fails
Critical suppliers Criticality is set by what stops if they stop, not by annual value Lost output and missed customer orders
Single-source dependencies No field in the vendor master says "no alternative is qualified" No fallback when supply breaks
Long switching time Qualification and tooling lead times live with engineering, not purchasing Months of exposure after a problem is found
Your money at their site Advances, deposits, tooling and free-issue material sit in different ledgers Cash and assets tied up if the vendor fails
Performance deterioration Delivery, rejection and emergency-shipment data are reviewed vendor by vendor, if at all A trend noticed only once it becomes a shortage
Outside developments New charges, filing gaps, legal cases and headcount changes are outside your systems Distress found after it has reached your plant

Consequence, not spend, is the right yardstick. Illustrative, not client data: a supplier with ₹1.2 crore of annual purchases makes a part fitted to products selling ₹3 crore a month. Switching would take six months. If it failed, up to ₹18 crore of sales would be at risk, fifteen times its spend. On a spend ranking it sits fortieth.

The vendor book also carries your own obligations. A registered micro or small supplier must be paid by the agreed date, which cannot be more than 45 days from acceptance, or within 15 days of acceptance if nothing was agreed (section 15 of the MSMED Act 2006). Late payment carries compound interest at three times the RBI bank rate under section 16. Companies report such dues outstanding beyond 45 days in the half-yearly Form MSME-1, and the Schedule III payables ageing shows MSME dues separately. A supplier that stops filing GST returns can also cost you input tax credit (vendor not filing GST). A portfolio review therefore reads both directions: the supplier's risk to you, and your exposure on the supplier.

The solutions: how companies watch a supplier base, and where each stops

Each tool covers one dimension; a portfolio review joins them so that depth goes only where a sourcing or exposure decision depends on it.

Exhibit 2: Ways to review a supplier base

# Approach What it covers What it leaves to you When it is the better choice
1 ERP vendor rating and procurement scorecards Delivery, quality and price, vendor by vendor Criticality, switching time, money at the site, anything outside your data Stable categories with many alternatives
2 Quality and process audits by your own team Technical capability and process control at the plant Financial health, legal change, concentration across the base Qualifying a vendor; after a quality failure
3 Supplier-risk software or public-record alerts Fast flags on filings, charges, cases and news Which alerts matter for your operations; your own performance record Very large bases with a team to triage alerts
4 Company-information or bureau reports Financial statements, charges, a score; bureau data with consent Your record with the vendor; no record for proprietorships and partnerships A financial refresh on a few large suppliers
5 Dual sourcing, safety stock and advance guarantees Protection once a risk is known Knowing where to apply it; each one costs money After a critical dependency is identified
6 A third-party risk programme run by a consulting firm Framework, policies, a risk register The evidence on each material vendor, and the ongoing review Building governance from scratch
7 GGA Vendor Portfolio Review The whole base read on criticality, dependency, exposure, performance and outside evidence; shortlist for deeper review The sourcing, allocation and continuation decisions Before a sourcing strategy, renewal cycle or rationalisation; when the base has outgrown its governance

What you can do this week

  1. Ask engineering and production, not purchasing, to name the parts that stop a line within a week if supply stops. Map those parts to vendors.
  2. Mark each of those vendors single-source or not, and write the time it would take to qualify an alternative.
  3. List every advance, deposit, tool and lot of free-issue material at a vendor's site, with its value and the document that proves your ownership.
  4. Pull your own payment days to micro and small suppliers. Any payment after the agreed date (15 days from acceptance if none was agreed) carries interest you owe; dues beyond 45 days also go into Form MSME-1 — see verify a vendor's Udyam status.
  5. Re-run the GST filing table for the top 30 critical vendors.
  6. Check the vendor master for two vendors sharing one bank account, or a bank account changed in the last quarter; verify each change before the next payment (vendor bank account change fraud).

Why GGA: an attention map built on consequence, with evidence applied only where it can change a decision

A shortlist with reasons, not a league table. The review produces an exception-led view of the supplier base, not a generic ranking of every vendor. It records why each supplier was flagged and what evidence would close the exception.

Six views. GGA maps your data into six categories that management can act on: critical suppliers; single-source dependencies; performance deterioration in delivery, quality, emergency shipments or lead time; switching constraints; client exposure through advances, deposits, tooling or other client-owned assets; and material financial, legal, capacity or continuity developments outside your systems.

Evidence follows consequence. Independent validation can be applied to the full base, to selected critical vendors, or only to the exceptions that warrant an Extended Desk questionnaire or Site Verification. Depth rises with the operational and financial consequence of failure. GGA confirms definitions before comparing suppliers, so a criticality rating in one plant means the same in another. Delivery data that cannot be trusted, or ownership of tooling that cannot be shown, is marked NOT KNOWN. Where a vendor's own account conflicts with its filings or headcount, contradiction control applies, and correlation is never presented as cause.

Exhibit 3: Criticality and condition — four positions, four responses

Supplier condition sound Supplier condition weakening
High criticality Protect: second source or safety stock; review yearly Act now: Existing Vendor Review, cap advances, plan a qualified alternative
Low criticality Light-touch monitoring Reduce allocation; replace at renewal

Three layers of output. 30 seconds — the answer: the GGA View on the supplier base and the shortlist. Illustrative only, not a client case: "Fourteen vendors are critical; six of them are single-source with switching times over six months, and two hold advances above ₹50 lakh. One of those two has filed GST returns late for four months. View: full review of that vendor first; cap new advances to the pair; begin qualifying second sources for the three highest-consequence parts. Tooling ownership at two sites NOT KNOWN." 5 minutes — the case: criticality, dependency, exposure, performance trends and outside evidence on the material vendors. Reference — the proof: the Excel management and action file for every vendor, with its exception, reason and closing evidence; the evidence register; individual drill-downs. The result can become the baseline for periodic monitoring. See the vendor executive summaries and the methodology.

Vendor Portfolio Review or Existing Vendor Review?

Exhibit 4: Supplier base against one supplier

Vendor Portfolio Review Existing Vendor Review
The question Which suppliers deserve deeper evidence, and why? Is this supplier's performance changing, and does outside evidence explain it?
Scope The supplier base, a category or a plant One vendor
Evidence Your data for every vendor; outside checks or site visits only for critical vendors and exceptions 12–36 months of your record with that vendor, tested against independent evidence
Output Attention map, exception register, Excel action file, drill-downs Executive summary with continuation conditions, mitigation and monitoring points
Typical trigger Sourcing strategy, renewal cycle, rationalisation, rising dependency Delivery or quality slipping; a large advance; a public notice

Flagged vendors move into an Existing Vendor Review. A new supplier joining the base goes to Vendor Intelligence; before any large advance, see advance payment to a new supplier. Early warning signs for one supplier are set out in signs your supplier is in trouble.

The checks GGA runs across the supplier base

A vendor is flagged only when a check could change a sourcing, continuity or exposure decision.

Exhibit 5: Vendor portfolio checks — data, exception, likely action

Check Data used What an exception looks like Likely action
Vendor master hygiene Vendor master, GSTIN, PAN, bank details Duplicate vendors; one bank account shared by two vendors; recent bank change Verification before payment
Spend concentration Purchase value by vendor and group A rising share of a category with one group Allocation review
Criticality and single source Bill of materials, sourcing records Critical part with no qualified alternative Second-source plan
Switching time Qualification and tooling records Alternative would take months to qualify Dependency decision
Client exposure Advances, deposits, tooling and free-issue registers Large advance or unrecorded tooling at a weakening vendor Advance cap; ownership documents
Delivery and quality POs, GRNs, inspection and corrective-action records On-time delivery or rejections outside the vendor's own range Existing Vendor Review
Emergency supply Expedite and airfreight logs Rising emergency shipments on one vendor's parts Capacity check
Your payments to MSE vendors Payables ledger, Udyam category Dues beyond 45 days from acceptance Payment and Form MSME-1 correction
GST and PF pattern GST filing table; EPFO establishment search Late or missing returns; falling headcount Outside validation
Corporate, legal and insolvency signals MCA records, eCourts, NCLT, IBBI; bureau data with consent New charges, creditor suits, an insolvency petition Independent or on-ground validation

What GGA would do

Your sourcing record first, then outside evidence on the vendors that matter. Labels show sequence, not a promised turnaround.

  1. Day 1: agree scope and definitions. Plants, categories, what "critical" and "single-source" mean for you. You receive: a data request matched to your systems, with the gaps already known.
  2. Days 2–5: map the base. Vendors grouped, spend, criticality, sourcing status, switching time and client exposure joined. You receive: a data-quality note and the vendor-master exceptions.
  3. Week 2: read performance and dependency. Delivery, quality, lead time and emergency supply set against criticality. You receive: the attention map; any vendor already putting supply at risk is flagged to you at once.
  4. Weeks 2–3: validate the critical exceptions. Desk evidence; a structured questionnaire or Site Verification only as agreed. You receive: what the outside evidence supports, contradicts or cannot explain, sourced and dated.
  5. Week 3: management output. You receive: the 30-second answer, the 5-minute case, the Excel action file and the shortlist for Existing Vendor Reviews.
  6. Month 2 onwards, if you choose: monitor the baseline. You receive: movement since the last run and the exceptions closed.

What we need from you

To start

  • Number of active vendors and annual purchase value
  • Which plants or categories are in scope
  • Any list of critical or single-source parts you already hold, and what prompted the review

To act

  • Vendor master with GSTIN, PAN, Udyam number and bank details
  • 12, 24 or 36 months of POs, GRNs and promised and actual delivery dates
  • Rejection, inspection and corrective-action records
  • Advances, deposits, tooling and free-issue material registers
  • Switching time and qualification status of alternatives
  • Your payables ledger for micro and small vendors
  • Vendor consent for bureau data on selected names, and agreement for any questionnaire or site visit

Missing some of these? Send what you have — telling you what is missing is part of the first reply.

How you stay in control

Procurement and business owners decide; GGA shows where the evidence says to look.

  • Sourcing, allocation, advance and continuation decisions belong to your authorised owners. GGA does not approve, reject or rate any vendor and does not replace technical qualification.
  • No supplier hears from GGA, or receives a visit, unless you have agreed it.
  • Bureau data on a vendor is obtained only with that vendor's consent.
  • Every exception names its data source and the date of each outside fact; what cannot be shown — tooling ownership, an unrecorded advance — is written as NOT KNOWN.
  • Your purchasing data and vendors' personal data are handled under NDA and the DPDP Act 2023, on a need-to-know basis.
  • A signal that supply is at risk, or of fraud, found during the work — an insolvency filing, a suspicious bank change — is reported to you immediately.

Send us your number of active vendors, annual purchase value and any list of critical parts, and the decision the review must support. Within one working day a named GGA specialist replies with what we would check first and what is missing from the file — no charge, no obligation. gg@ggaindia.co.in

Checking an overseas buyer? See the Global Receivables Desk. An overseas company checking an Indian counterparty? See India counterparty due diligence.

Frequently asked questions

What is a vendor portfolio review?

A review of the whole supplier base, or a category, to find the relationships that need management attention because of criticality, dependency, switching time, money at the vendor's site, slipping performance or outside developments. It ends in a shortlist, not a ranking.

How is it different from an Existing Vendor Review?

The portfolio review decides which suppliers deserve deeper evidence. The Existing Vendor Review examines one supplier's performance change in depth and what outside evidence explains it.

How do I identify critical suppliers?

By consequence: what stops, and for how long, if the supplier stops. Combine that with single-source status and switching time. Spend is a weak proxy; a low-value part can be the most critical.

Does the review cover our MSME payment obligations?

It flags micro and small supplier status, agreed payment terms and overdue balances for your advisers to assess the applicable MSMED Act, Form MSME-1, accounting and tax obligations. Registration, transaction facts and company applicability must be checked; a single ageing threshold is not a complete compliance test. The legal and tax treatment remains for your advisers; see verify a vendor's Udyam status.

Does every vendor get checked externally?

No. Outside evidence goes to the full base, selected critical vendors or only the exceptions, as agreed. Depth rises with the consequence of failure.

What does it cost and how long does it take?

It depends on the number of vendors, the data you hold and how many critical vendors need outside or field checks. GGA confirms scope and fee in writing before work starts.

Related: vendor due diligence India · why review existing vendors · all due-diligence guides

Sources

This page summarises the position as at 8 November 2026. Portal features, rules and thresholds change; check the current position before relying on any single source.

Email GGA gg@ggaindia.co.in